Friday, April 24, 2015

Upgrade Oracle E-Business Suite Release 12.2 to R12.2.4 (New Installation Customers)


UPGRADE ORACLE APPLICATION DOCUMENT    (1587195.1)


Upgrade for New Installation Customers upgrading to Oracle E-Business Suite 12.2.4

Step 1:                 Doc Id: 1320300.1 >>>>>>>>>>  Section 1 & 2

  • Start CD version 12.2.0.0.47 (This is my Case and I have Two Nodes (APPS 64Bit & DB 64Bit)
  • Check OS RPM on Both Nodes Document 1330701.1 “Must be Done”.                           
  • ETCC EBS Technology code level checker (All customers must apply these patches)
 1.1-      Apply Patch 17537119 (./checkDBpatch.sh) apply all patches with. /opatch utility which aren't apply.
 1.2-      Apply Patch 17268684
 1.3- Post Scripts must be apply

Step 2:                 Doc Id: 1594274.1
  Technology Patches   (Database Version 11.2.0.3)

Step 3:                    Doc Id : 1320300.1
                
Apply Consolidate Patch
                                    
Take Backup

Step 4:              Doc id: 1617461.1

Apply Patch 19197270 

Apply Patch 19330775
                                     
Take Backup


Step 5:  Release Update Patch New Installation Customers upgrading to Oracle E-Business Suite 12.2.4


Apply Patch RUP 17919161

Issue found during cutover phase RUP Apply TEMP tablespace was full:-
 ERROR at line 1:
ORA-20001: [CUTOVER 64:5 ddl_id=26613] Fatal Error, exiting. ORA-01652: unable
to extend temp segment by 128 in tablespace TEMP2 SQL: begin
ad_zd_table.cutover('WIP', 'WIP_TIME_ENTRY_INTERFACE'); end;
ORA-06512: at "APPS.AD_ZD_PARALLEL_EXEC", line 528
ORA-06512: at line 16


Solution:               Increase 75 GB more int TEMP tablespace 

adop phase=apply apply_mode=downtime patches=17919161 options=forceapply restart=no abandon=yes  

Apply Additional Critical Patches (Post Patches)



 Login screen after successful upgrade from 12.2 to 12.2.4