UPGRADE ORACLE APPLICATION DOCUMENT (1587195.1)
Upgrade for New Installation Customers upgrading to Oracle E-Business Suite 12.2.4
Step 1: Doc Id: 1320300.1 >>>>>>>>>> Section 1 & 2
- Start CD version 12.2.0.0.47 (This is my Case and I have Two Nodes (APPS 64Bit & DB 64Bit)
- Check OS RPM on Both Nodes Document 1330701.1 “Must be Done”.
- ETCC EBS Technology code level checker (All customers must apply these patches)
1.1-
Apply Patch 17537119 (./checkDBpatch.sh) apply all patches with. /opatch
utility which aren't apply.
1.2-
Apply Patch 17268684
1.3- Post Scripts
must be apply
Step 2:
Doc Id: 1594274.1
Technology Patches (Database Version 11.2.0.3)
Step 3:
Doc Id : 1320300.1
Apply Consolidate Patch
“Take Backup”
Step 4:
Doc id: 1617461.1
Apply Patch
19197270
Apply Patch
19330775
“Take Backup”
Step 5: Release
Update Patch New Installation Customers upgrading to Oracle E-Business Suite
12.2.4
Apply Patch RUP
17919161
ERROR at
line 1:
ORA-20001:
[CUTOVER 64:5 ddl_id=26613] Fatal Error, exiting. ORA-01652: unable
to extend temp
segment by 128 in tablespace TEMP2 SQL: begin
ad_zd_table.cutover('WIP',
'WIP_TIME_ENTRY_INTERFACE'); end;
ORA-06512: at
"APPS.AD_ZD_PARALLEL_EXEC", line 528
ORA-06512: at
line 16
Solution:
Increase 75 GB more int TEMP tablespace
adop phase=apply
apply_mode=downtime patches=17919161 options=forceapply restart=no
abandon=yes
Apply Additional
Critical Patches (Post Patches)
Login
screen after successful upgrade from 12.2 to 12.2.4